I started with having to replace the tile on my kitchen floor due to cracking a few. As I pulled up the tile, I realized the sub floor needed to be replaced as well. So, I got to work cutting out the floor and replacing it with new sub floor. Then I was able to start the tile. I laid each one out and cut the tile with my Ryobi wet tile saw. After all that I grouted the floor and sealed it. I also ended up putting some trim around the base board. Since I redid the floor I had to redo the lighting, so used my drills to help put those up, (total 4 lights).
I started with having to replace the tile on my kitchen floor due to cracking a few. As I pulled up the tile, I realized the sub floor needed to be replaced as well. So, I got to work cutting out the floor and replacing it with new sub floor. Then I was able to start the tile. I laid each one out and cut the tile with my Ryobi wet tile saw. After all that I grouted the floor and sealed it. I also ended up putting some trim around the base board. Since I redid the floor I had to redo the lighting, so used my drills to help put those up, (total 4 lights).