Complete demo inside and out. Installing new sub floors. Relocating walls to make a open floor plan. Re-framing exterior walls for new door locations and bigger windows. Re-routing electrical outlets and switches. Insulating exterior walls. Hanging and finishing sheetrock. Building and installing cabinets. Install laminate wood flooring. Install interior doors and trim. Install moisture barrier and vinyl siding. Hang exterior trim and paint.
Complete demo inside and out. Installing new sub floors. Relocating walls to make a open floor plan. Re-framing exterior walls for new door locations and bigger windows. Re-routing electrical outlets and switches. Insulating exterior walls. Hanging and finishing sheetrock. Building and installing cabinets. Install laminate wood flooring. Install interior doors and trim. Install moisture barrier and vinyl siding. Hang exterior trim and paint.