Time to bring this bathroom and kitchen into the modern age as cost effective as possible. Kitchen tile tear out and new installed ,new lighting,New flooring and paint. As for the bathroom new vanity install which area was 1/2 inch to short so we had to trim cabinet to fit,Those silly builders who built this place lol. Wall repairs and paint and tub kit install.
Time to bring this bathroom and kitchen into the modern age as cost effective as possible. Kitchen tile tear out and new installed ,new lighting,New flooring and paint. As for the bathroom new vanity install which area was 1/2 inch to short so we had to trim cabinet to fit,Those silly builders who built this place lol. Wall repairs and paint and tub kit install.