Return to Projects Listing
Hill trolly on tracks how to move tons of hardware
Hill trolly on tracks how to move tons of hardware
Hill trolly on tracks how to move tons of hardware
Hill trolly on tracks how to move tons of hardware
  • Hill trolly on tracks how to move tons of hardware
  • Hill trolly on tracks how to move tons of hardware
  • Hill trolly on tracks how to move tons of hardware
  • Hill trolly on tracks how to move tons of hardware

Hill trolly on tracks how to move tons of hardware

Again as a water access only lot, All came over by barges made with Ryobi tools, next problem was either hand carry every thing up 25 step uphill around 70 feet, on a 35 / 40 degree angle. So with a little imagination and the tools I know can do the job with 18Volts of power. So I made a trolly using 2/6 pressure treated lumber and 4x4 pressure treated lumber and 2x8 pressure treated Lumber from HD. So made tracks using the above lumber again using my Ryobi tools for 80% of the work over a 3 day period, and with 4500 LBS winch to pull all amterial up the hill on trolly, to build log Cabin again using my Ryobi tools for a lot of the work with screwing on the tin roof still to come.

Larry1956

Larry1956

All Projects | Profile


  • share

Project Information

Difficulty: Intermediate
Category: Construction, Other

also by Larry1956


Related Projects


Recently Viewed Projects