Return to Projects Listing
Large e6edb196 be17 4940 9b57 944e419c34d9
Large 50d0b8e7 5ab6 408a a0c9 3214823287d5
Large 7c90c109 93a9 402c 82b6 cd1fd884c1c6
Large b06882d6 b98e 48af b84a e16de95af720
  • Medium e6edb196 be17 4940 9b57 944e419c34d9
  • Medium 50d0b8e7 5ab6 408a a0c9 3214823287d5
  • Medium 7c90c109 93a9 402c 82b6 cd1fd884c1c6
  • Medium b06882d6 b98e 48af b84a e16de95af720

Hill trolly on tracks how to move tons of hardware

Again as a water access only lot, All came over by barges made with Ryobi tools, next problem was either hand carry every thing up 25 step uphill around 70 feet, on a 35 / 40 degree angle. So with a little imagination and the tools I know can do the job with 18Volts of power. So I made a trolly using 2/6 pressure treated lumber and 4x4 pressure treated lumber and 2x8 pressure treated Lumber from HD. So made tracks using the above lumber again using my Ryobi tools for 80% of the work over a 3 day period, and with 4500 LBS winch to pull all amterial up the hill on trolly, to build log Cabin again using my Ryobi tools for a lot of the work with screwing on the tin roof still to come.

Large no avatar

Larry1956

All Projects | Profile


  • share

Project Information

Difficulty: Intermediate
Category: Construction, Other

also by Larry1956


Related Projects


Recently Viewed Projects