Return to Projects Listing
Large 8369e413 dac6 48ac 96bd 996e936f8e50
Large 9eb2ecbb 204a 439c 8e8f 1d24bbd1211d
Large 1b4ce32e 73b6 4e91 8beb 805215271863
Large 79712ed5 6246 4c31 a0ae 54b89d03e296
Large 7783e28c d3a3 4820 b7a5 61803cd3becb
Large 29e81ff5 6a80 4a83 b2dd 1867e3e12926
Large ed0cf56d 0ea9 4896 8fe3 21b2b8931be7
Large fc83ab71 e952 4d70 8c1a f6cd5dc58e10
Large 820a36b9 f4e2 467e b775 0de8d21b69f2
  • Medium 8369e413 dac6 48ac 96bd 996e936f8e50
  • Medium 9eb2ecbb 204a 439c 8e8f 1d24bbd1211d
  • Medium 1b4ce32e 73b6 4e91 8beb 805215271863
  • Medium 79712ed5 6246 4c31 a0ae 54b89d03e296
  • Medium 7783e28c d3a3 4820 b7a5 61803cd3becb
  • Medium 29e81ff5 6a80 4a83 b2dd 1867e3e12926
  • Medium ed0cf56d 0ea9 4896 8fe3 21b2b8931be7
  • Medium fc83ab71 e952 4d70 8c1a f6cd5dc58e10
  • Medium 820a36b9 f4e2 467e b775 0de8d21b69f2

Bathroom Makeover - New Ceiling

Put a new ceiling in my bathroom - framed, insulated, sheet rocked, added a texture and painted. Installed a fan, built a storage area above clothes closet and installed flat screen TV. That project took about a year. I started the demolition in November of 2009 of the bathroom ceiling removing old lathe & plaster. This allowed access to the third floor knee walls, so I insulated there. Then the beginning of 2010, I started the framing and throughout the year taking my time, I insulated, sheet rocked, and added a texture and painted; ending the project that December. I used my Ryobi tool throughout my project, drilling and screwing when needed. I must say, I’ve had my Ryobi Drill since 2003 – 2004 and I have dropped it several times and it is still going. I am planning to give my bedroom a makeover, replacing the wainscoting and will be using my Ryobi drill.



  • share

Project Information

Difficulty: Intermediate
Category: Renovations,


Related Projects


Recently Viewed Projects