Return to Projects Listing
Large 0a777bc2 8785 4bb8 8f74 3429ece4bac3
Large 39325fc7 bb36 44da 9d73 d6b221d298b6
Large 3391bf4c 0769 4a53 91f6 9cfadae12766
Large 908d3136 303c 469e af1f 67f6560fea6e
Large 7a950711 2d46 488a b248 3865c861b26d
Large ec1feaf8 0743 4821 8ef1 f2f893f12f5d
  • Medium 0a777bc2 8785 4bb8 8f74 3429ece4bac3
  • Medium 39325fc7 bb36 44da 9d73 d6b221d298b6
  • Medium 3391bf4c 0769 4a53 91f6 9cfadae12766
  • Medium 908d3136 303c 469e af1f 67f6560fea6e
  • Medium 7a950711 2d46 488a b248 3865c861b26d
  • Medium ec1feaf8 0743 4821 8ef1 f2f893f12f5d

Back Yard Improvements Deck, Outside Patio

Our summer back yard projects included extending the deck to accommodate our new “Hot Tub”, adding a privacy wall around the “Hot Tub, as well as constructing a large flower box. The length of time to complete this breaks down as follows: 1.) Flower/Strawberry boxes 41/2 hours 2) pavers & sod 3 hours 3.) Decking addition 19 hours 4.) Privacy wall 7 ½ hours for a total of 34 hours work hours to complete start to finish. This initially started out as getting the decking and privacy wall added for the Hot Tub, (which had sat in the garage since Christmas). As the Privacy wall neared completion, my wife decided I should also construct a Flower Box & a Strawberry Box which would with stand the attempted onslaught of doggie watering….( Doggie watering had become her biggest nemesis in as far as preventing hardy flower growth as well as the desire of eating the berries.) These went in the outside patio area which also had new pavers laid as well as sod. Now we are down to the stain ..Using my Ryobi Tools made these projects a lot easier and lot more enjoyable doing . Thanks Ryobi , I’m replacing everything I have that is feasible with you guys!

Large de392346 3fa4 4972 9919 94a011492f83

TRHowell

All Projects | Profile


  • share

Project Information

Difficulty: Advanced
Category: Exterior Spaces,

also by TRHowell


Related Projects


Recently Viewed Projects