Return to Projects Listing
Large 40741688 7e1d 4294 b866 551a3b7f0220
Large e055b788 843a 46f3 98ae 0c39f1896122
Large f22ec036 b723 4d6c bf0b 19a2fcfc0286
Large 6b5292fa c2f1 4afb 8f3a aeabe7b62089
  • Medium 40741688 7e1d 4294 b866 551a3b7f0220
  • Medium e055b788 843a 46f3 98ae 0c39f1896122
  • Medium f22ec036 b723 4d6c bf0b 19a2fcfc0286
  • Medium 6b5292fa c2f1 4afb 8f3a aeabe7b62089

Completed a bathroom remodel that was abandoned

I took over this bathroom remodel when the person before took it on and 6 months ago and never finished it. I had to correct many problems that were done by the other person. I own almost every tool Ryobi makes and used most of them on this project. I even have the rare SPC18 and the miter saw came in very handy. But my main tool was the multi tool (P246). I have several heads and this makes it very quick to change to take care of the job at hand. Like when I came to the floor register vent, I put the new sub floor down, and used the multi tool to rough cut the openning. Then I used the speed saw to make the fit perfect. With my 6 port charger and more than 30 batteries, I was able to keep on going and never was without power.


Related Projects


Recently Viewed Projects